OFFSHORE RENEWABLES CONSTRUCTION

EMBRACING THE NEW ENERGY CHANGE

Adira Renewables is a one-stop solutions provider in the renewables industry. We provide in-house, tailor-made solutions for our clients, covering a wide spectrum of activities like horizontal directional drilling, near shore cable installation, offshore substation commissioning services, onshore/nearshore heavy lifting, transport, towage and storage.

We also provide solutions for rock berm foundation installation as part of port development projects. Our two Singapore based construction yards are specialised in the construction of new build or modification of barges and vessels, primary and secondary offshore steel constructions and custom build project equipment for cable and rock installation scopes.

1. Horizontal Directional Drilling

  • Thaitan International Pte. Ltd. (TIPL), like Adira Renewables, is a part of the Kim Heng Group, that provides a integrated package of Horizontal Directional Drilling (HDD) services for beach landings & cable crossings for both power cables & optic cables.

 

  • Thaitan International has a large track record of HDD projects across the Asian region. We have installed the HDD’s for export cable crossings for the Yunlin, Changfang/Xidao and Chong Neng offshore wind farm projects.
For more information, please visit Thaitan International Pte Ltd at www.thaitan.com.sg.

2. Export Cable Laying Barge

  • Adira Renewables supported the nearshore export cable installation for the Greater Changhua wind farm project. The Kim Heng 186 barge was modified with two spuds, a 4-point mooring system, and a 150 tonnes crawler crane, for installation of the export cable in shallow water

 

  • Adira Renewables is developing a DP2 cable lay barge equipped with a 3000-5000 ton turntable for nearshore export cable and interconnector installation projects. Besides the DP2 system of Kongsberg, the cable lay barge will also be equipped with a 6-point mooring system and will therefore have unique nearshore capabilities.

3. Offshore Substation Commissioning Services

  • Adira Renewables has provided manpower, procurement, equipment supply and logistic support for commissioning services for the offshore sub-station topside of the Taiwan Greater Changhua offshore windfarm project.

4. Wind Turbine Installation

  • Adira Heavy Lift, a subsidiary of Adira Renewables has installed a total of 26 towers and WTG’s for the Hoa Binh 5 onshore wind farm project in Vietnam with the 1,250T crawler crane operated by Adira Heavy Lift.

 

  • For the Tan Phu Dong 1 nearshore wind farm, the 1,250T crawler crane operated from a 330 ft barge to install the 24 towers and WTG’s in the intertidal area of Hoa Binh coast line.

5. GEOTECHNICAL SURVEY SERVICE

  • GTS gathers seabed samples and physical characteristics of the soil and rocks to properly design the foundations.

 

  • The cooperation with Soiltech will deliver learning improvements on GTS for further expansion into OWF Pre-Construction Market. This 4+2 Years Exclusivity Agreement is expected to bring Kim Heng Group continuous collaboration with wind farm developer CIP. Potential opportunities to be awarded Horizontal Directional Drilling and Cable Laying Projects after the GTS works are well completed.

 

  • No Korean Geotechnical Survey Contractor is qualified to operate in deep water (30m+), bringing opportunities to international players.

TRACK RECORDS

HORIZONTAL DIRECTIONAL DRILLING

Hai Long Offshore Wind Farm

  • Engineering Procurement & Construction of 4 x landfalls / shore crossings by Horizontal Directional Drilling (HDD) for installation of 560mm OD HDPE cable conduits, with a total HDD length of 4936m.
  • Seaway Offshore Cables ( S7)
  • May – Dec 2023

Zhong Neng Offshore Windfarm

  • Engineering Procurement & Construction of 4 x landfalls / shore crossings by Horizontal Directional Drilling (HDD) for installation of 500mm OD HDPE cable conduits, with a total HDD length of 2000m.
  • Seaway Offshore Cables / Seaway 7
  • July – Oct 2022

CFXD Offshore Windfarm

  • Engineering Procurement & Construction of 7 x landfalls / shore crossings by Horizontal Directional Drilling (HDD) for installation of 500mm OD HDPE cable conduits
  • Seaway Offshore Cables / Seaway 7
  • Apr – Oct 2021

Yunlin Offshore Windfarm

  • Engineering Procurement & Construction of 12 x landfalls / shore crossings by Horizontal Directional Drilling (HDD) for installation of 450mm OD HDPE cable conduits
  • Seaway Offshore Cables / Seaway 7
  • Apr – Sep 2020

EXPORT CABLE LAYING SUPPORT

 

Greater Changhua Offshore Wind Farm project

  • Float out, installation and pull in services including installation of cable protection system for the nearshore section of the three export cables.
  • Van Oord
  • Execution 2020-2022

OFFSHORE SUBSTATION SUPPORT & COMMISSIONING

 

Greater Changhua 1 and 2a

  • Providing offshore installation services (personnel) for commissioning and testing of offshore substation
  • Keppel Fels
  • 2021-2022

WIND TURBINE ASSEMBLY

 

HOA BÌNH 5 Onshore Windfarm

  • Installation of 26 towers and turbines of 3.0 MW each with a 1.250 ton crane
  • Hacom Holdings
  • 2021

Tan Phu Dong 1

  • Installation of towers and 3 MW turbines with 1.250 ton crane on 330 ft barge for a nearshore wind farm
  • Gai Lai Electricity Company
  • 2022

PROJECT GALLERY

Contact us for more information

Kim Heng Business

Offshore Renewable Construction

HDD entails the implementation of a dirigible, trenchless technique and design for the installation of underground cables and pipelines. Kim Heng being an experience turnkey HDD contractor, is capable to undertake the seamless integration of Front End Engineering Design (FEED) by offering a one stop solution on outfall projects. 

Marine Construction

Upon confirmation on the types of foundations to be used at site, Kim Heng can undertake the full turnkey construction project in our very own fabrication shipyards which are equipped with modern construction facilities and machineries to fabricate customized large steel structures and equipment.

Shipbuilding & Engineering

As part of a good maintenance program throughout the entire project lifespan, Kim Heng can provide self-constructed, locally flagged and operated CTV vessels and offshore support vessels equipped with walk to work gangway to ferry GWO-trained service engineers and technicians to service offshore wind turbine operation.

Offshore Chartering, Towage & Transportation

Our long term strategy is to enhance our competitiveness & capabilities to own and operate a comprehensive fleet of AHTS, AHT, Tugs & Barges and Fast Crafts to provide anchor handling operation and other support services for your offshore operation needs.

Offshore Oilfield Services

With over 50 years of marine & offshore experience, Kim Heng has been a trusted partner in the provision of port agency services, rig towage & mobilization, rig repair, steel structure fabrication and maintenance of rig drilling tubulars & equipment.